To repeal sections 644.016, 644.051 and 644.052, RSMo, relating to water permitting, and to enact in lieu thereof three new sections relating to the same subject.


Be it enacted by the General Assembly of the State of Missouri, as follows:

Section A. Sections 644.016, 644.051 and 644.052, RSMo, are repealed and three new sections enacted in lieu thereof, to be known as sections 644.016, 644.051 and 644.052, to read as follows:

644.016. When used in sections 644.006 to 644.141 and in standards, rules and regulations promulgated pursuant to sections 644.006 to 644.141, the following words and phrases mean:

(1) "Aquaculture", a facility which uses either warm or cold water for the controlled propagation, growth and harvest of aquatic organisms;

(2) "Commission", the clean water commission of the state of Missouri created in section 644.021;

[(2)] (3) "Conference, conciliation and persuasion", a process of verbal or written communications consisting of meetings, reports, correspondence or telephone conferences between authorized representatives of the department and the alleged violator. The process shall, at a minimum, consist of one offer to meet with the alleged violator tendered by the department. During any such meeting, the department and the alleged violator shall negotiate in good faith to eliminate the alleged violation and shall attempt to agree upon a plan to achieve compliance;

[(3)] (4) "Department", the department of natural resources;

[(4)] (5) "Director", the director of the department of natural resources;

[(5)] (6) "Discharge", the causing or permitting of one or more water contaminants to enter the waters of the state;

[(6)] (7) "Effluent control regulations", limitations on the discharge of water contaminants;

[(7)] (8) "General permit", a permit written with a standard group of conditions and with applicability intended for a designated category of water contaminant sources that have the same or similar operations, discharges and geographical locations, and that require the same or similar monitoring, and that would be more appropriately controlled pursuant to a general permit rather than pursuant to a site-specific permit;

[(8)] (9) "Human sewage", human excreta and wastewater, including bath and toilet waste, residential laundry waste, residential kitchen waste, and other similar waste from household or establishment appurtenances;

[(9)] (10) "Income" includes retirement benefits, consultant fees, and stock dividends;

[(10)] (11) "Minor violation", a violation which possesses a small potential to harm the environment or human health or cause pollution, was not knowingly committed, and is not defined by the United States Environmental Protection Agency as other than minor;

[(11)] (12) "Permit by rule", a permit granted by rule, not by a paper certificate, and conditioned by the permit holder's compliance with commission rules;

[(12)] (13) "Permit holders or applicants for a permit" shall not include officials or employees who work full time for any department or agency of the state of Missouri;

[(13)] (14) "Person", any individual, partnership, copartnership, firm, company, public or private corporation, association, joint stock company, trust, estate, political subdivision, or any agency, board, department, or bureau of the state or federal government, or any other legal entity whatever which is recognized by law as the subject of rights and duties;

[(14)] (15) "Point source", any discernible, confined and discrete conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, from which pollutants are or may be discharged;

[(15)] (16) "Pollution", such contamination or other alteration of the physical, chemical or biological properties of any waters of the state, including change in temperature, taste, color, turbidity, or odor of the waters, or such discharge of any liquid, gaseous, solid, radioactive, or other substance into any waters of the state as will or is reasonably certain to create a nuisance or render such waters harmful, detrimental or injurious to public health, safety or welfare, or to domestic, industrial, agricultural, recreational, or other legitimate beneficial uses, or to wild animals, birds, fish or other aquatic life;

[(16)] (17) "Pretreatment regulations", limitations on the introduction of pollutants or water contaminants into publicly owned treatment works or facilities which the commission determines are not susceptible to treatment by such works or facilities or which would interfere with their operation, except that wastes as determined compatible for treatment pursuant to any federal water pollution control act or guidelines shall be limited or treated pursuant to this chapter only as required by such act or guidelines;

[(17)] (18) "Residential housing development", any land which is divided or proposed to be divided into three or more lots, whether contiguous or not, for the purpose of sale or lease as part of a common promotional plan for residential housing;

[(18)] (19) "Sewer system", pipelines or conduits, pumping stations, and force mains, and all other structures, devices, appurtenances and facilities used for collecting or conducting wastes to an ultimate point for treatment or handling;

[(19)] (20) "Significant portion of his or her income" shall mean ten percent of gross personal income for a calendar year, except that it shall mean fifty percent of gross personal income for a calendar year if the recipient is over sixty years of age, and is receiving such portion pursuant to retirement, pension, or similar arrangement;

[(20)] (21) "Site-specific permit", a permit written for discharges emitted from a single water contaminant source and containing specific conditions, monitoring requirements and effluent limits to control such discharges;

[(21)] (22) "Treatment facilities", any method, process, or equipment which removes, reduces, or renders less obnoxious water contaminants released from any source;

[(22)] (23) "Water contaminant", any particulate matter or solid matter or liquid or any gas or vapor or any combination thereof, or any temperature change which is in or enters any waters of the state either directly or indirectly by surface runoff, by sewer, by subsurface seepage or otherwise, which causes or would cause pollution upon entering waters of the state, or which violates or exceeds any of the standards, regulations or limitations set forth in sections 644.006 to 644.141 or any federal water pollution control act, or is included in the definition of pollutant in such federal act;

[(23)] (24) "Water contaminant source", the point or points of discharge from a single tract of property on which is located any installation, operation or condition which includes any point source defined in sections 644.006 to 644.141 and nonpoint source pursuant to any federal water pollution control act, which causes or permits a water contaminant therefrom to enter waters of the state either directly or indirectly;

[(24)] (25) "Water quality standards", specified concentrations and durations of water contaminants which reflect the relationship of the intensity and composition of water contaminants to potential undesirable effects;

[(25)] (26) "Waters of the state", all rivers, streams, lakes and other bodies of surface and subsurface water lying within or forming a part of the boundaries of the state which are not entirely confined and located completely upon lands owned, leased or otherwise controlled by a single person or by two or more persons jointly or as tenants in common and includes waters of the United States lying within the state.

644.051. 1. It is unlawful for any person:

(1) To cause pollution of any waters of the state or to place or cause or permit to be placed any water contaminant in a location where it is reasonably certain to cause pollution of any waters of the state;

(2) To discharge any water contaminants into any waters of the state which reduce the quality of such waters below the water quality standards established by the commission;

(3) To violate any pretreatment and toxic material control regulations, or to discharge any water contaminants into any waters of the state which exceed effluent regulations or permit provisions as established by the commission or required by any federal water pollution control act;

(4) To discharge any radiological, chemical, or biological warfare agent or high-level radioactive waste into the waters of the state.

2. It shall be unlawful for any person to build, erect, alter, replace, operate, use or maintain any water contaminant or point source in this state that is subject to standards, rules or regulations promulgated pursuant to the provisions of sections 644.006 to 644.141 unless such person holds a permit from the commission, subject to such exceptions as the commission may prescribe by rule or regulation. However, no permit shall be required of any person for any emission into publicly owned treatment facilities or into publicly owned sewer systems tributary to publicly owned treatment works.

3. Every proposed water contaminant or point source which, when constructed or installed or established, will be subject to any federal water pollution control act or sections 644.006 to 644.141 or regulations promulgated pursuant to the provisions of such act shall make application to the director for a permit at least thirty days prior to the initiation of construction or installation or establishment. Every water contaminant or point source in existence when regulations or sections 644.006 to 644.141 become effective shall make application to the director for a permit within sixty days after the regulations or sections 644.006 to 644.141 become effective, whichever shall be earlier. The director shall promptly investigate each application, which investigation shall include such hearings and notice, and consideration of such comments and recommendations as required by sections 644.006 to 644.141 and any federal water pollution control act. If the director determines that the source meets or will meet the requirements of sections 644.006 to 644.141 and the regulations promulgated pursuant thereto, the director shall issue a permit with such conditions as he or she deems necessary to ensure that the source will meet the requirements of sections 644.006 to 644.141 and any federal water pollution control act as it applies to sources in this state. If the director determines that the source does not meet or will not meet the requirements of either act and the regulations pursuant thereto, the director shall deny the permit pursuant to the applicable act and issue any notices required by sections 644.006 to 644.141 and any federal water pollution control act.

4. [Before issuing a permit to build or enlarge a water contaminant or point source or reissuing any permit, the director shall issue such notices, conduct such hearings, and consider such factors, comments and recommendations as required by sections 644.006 to 644.141 or any federal water pollution control act. The director shall determine if any state or any provisions of any federal water pollution control act the state is required to enforce, any state or federal effluent limitations or regulations, water quality-related effluent limitations, national standards of performance, toxic and pretreatment standards, or water quality standards which apply to the source, or any such standards in the vicinity of the source, are being exceeded, and shall determine the impact on such water quality standards from the source. The director, in order to effectuate the purposes of sections 644.006 to 644.141, shall deny a permit if the source will violate any such acts, regulations, limitations or standards or will appreciably affect the water quality standards or the water quality standards are being substantially exceeded, unless the permit is issued with such conditions as to make the source comply with such requirements within an acceptable time schedule.] Prior to the development or renewal of a general permit or permit by rule, the director shall convene a meeting or meetings of permit holders, applicants and public to evaluate the pollution impacts of permits and to discuss any terms and conditions that may be necessary to protect waters of the state. Following the discussions, the director shall finalize a draft permit that considers the comments of the meeting participants and post the draft permit on notice for public comment. Concerned, affected public or applicants for new general permits, renewed general permits or permits by rule may request a hearing with respect to the new requirements in accordance with this section. If a request for a hearing is received, the commission shall hold a hearing to receive comments on issues of significant technical merit and concerns related to the responsibilities of the Missouri clean water law. The commission shall conduct such hearings in accordance with this section. After consideration of such comments, a final permit shall be issued. The time between the date of the hearing request and the hearing itself shall not be counted as time elapsed under subdivision (1) of subsection 12 of this section.

5. The director shall grant or deny the permit within sixty days after all requirements of the Federal Water Pollution Control Act concerning issuance of permits have been satisfied unless the application does not require any permit pursuant to any federal water pollution control act. The director or the commission may require the applicant to provide and maintain such facilities or to conduct such tests and monitor effluents as necessary to determine the nature, extent, quantity or degree of water contaminant discharged or released from the source, establish and maintain records and make reports regarding such determination.

6. The director shall promptly notify the applicant in writing of his or her action and if the permit is denied state the reasons therefor. The applicant may appeal to the commission from the denial of a permit or from any condition in any permit by filing notice of appeal with the commission within thirty days of the notice of denial or issuance of the permit. The commission shall set the matter for hearing not less than thirty days after the notice of appeal is filed. In no event shall a permit constitute permission to violate the law or any standard, rule or regulation promulgated pursuant thereto.

7. In any hearing held pursuant to this section the burden of proof is on the applicant for a permit. Any decision of the commission made pursuant to a hearing held pursuant to this section is subject to judicial review as provided in section 644.071.

8. In any event, no permit issued pursuant to this section shall be issued if properly objected to by the federal government or any agency authorized to object pursuant to any federal water pollution control act unless the application does not require any permit pursuant to any federal water pollution control act.

9. Nothing in this section shall require an aquaculture facility to obtain a site-specific permit. Aquaculture facilities shall be governed by a general permit issued pursuant to this section with a fee not to exceed two hundred fifty dollars pursuant to subdivision (5) of subsection 6 of section 644.052.

10. No manufacturing or processing plant or operating location shall be required to pay more than one operating fee. Operating permits shall be issued for a period not to exceed five years after date of issuance, except that general permits shall be issued for a five-year period, and also except that neither a construction nor an annual permit shall be required for a single residence's waste treatment facilities. Applications for renewal of an operating permit shall be filed at least one hundred eighty days prior to the expiration of the existing permit.

[10.] 11. Every permit issued to municipal or any publicly owned treatment works or facility shall require the permittee to provide the clean water commission with adequate notice of any substantial new introductions of water contaminants or pollutants into such works or facility from any source for which such notice is required by sections 644.006 to 644.141 or any federal water pollution control act. Such permit shall also require the permittee to notify the clean water commission of any substantial change in volume or character of water contaminants or pollutants being introduced into its treatment works or facility by a source which was introducing water contaminants or pollutants into its works at the time of issuance of the permit. Notice must describe the quality and quantity of effluent being introduced or to be introduced into such works or facility by a source which was introducing water contaminants or pollutants into its works at the time of issuance of the permit. Notice must describe the quality and quantity of effluent being introduced or to be introduced into such works or facility and the anticipated impact of such introduction on the quality or quantity of effluent to be released from such works or facility into waters of the state.

[11.] 12. The director or the commission may require the filing or posting of a bond as a condition for the issuance of permits for construction of temporary or future water treatment facilities in an amount determined by the commission to be sufficient to ensure compliance with all provisions of sections 644.006 to 644.141, and any rules or regulations of the commission and any condition as to such construction in the permit. The bond shall be signed by the applicant as principal, and by a corporate surety licensed to do business in the state of Missouri and approved by the commission. The bond shall remain in effect until the terms and conditions of the permit are met and the provisions of sections 644.006 to 644.141 and rules and regulations promulgated pursuant thereto are complied with.

[12.] 13. (1) The department shall issue or deny applications for construction and site-specific operating permits received after January 1, 2001, within one hundred eighty days of the department's receipt of an application. For general construction and operating permit applications received after January 1, 2001, that do not require a public participation process, the department shall issue or deny the requested permits within sixty days of the department's receipt of an application.

(2) If the department fails to issue or deny with good cause a construction or operating permit application within the time frames established in subdivision (1) of this subsection, the department shall refund the full amount of the initial application fee within forty-five days of failure to meet the established time frame. If the department fails to refund the application fee within forty-five days, the refund amount shall accrue interest at a rate established pursuant to section 32.065, RSMo.

(3) Permit fee disputes may be appealed to the commission within thirty days of the date established in subdivision (2) of this subsection. If the applicant prevails in a permit fee dispute appealed to the commission, the commission may order the director to refund the applicant's permit fee plus interest and reasonable attorney's fees as provided in sections 536.085 and 536.087, RSMo. A refund of the initial application or annual fee does not waive the applicant's responsibility to pay any annual fees due each year following issuance of a permit.

(4) No later than December 31, 2001, the commission shall promulgate regulations defining shorter review time periods than the time frames established in subdivision (1) of this subsection, when appropriate, for different classes of construction and operating permits. In no case shall commission regulations adopt permit review times that exceed the time frames established in subdivision (1) of this subsection. The department's failure to comply with the commission's permit review time periods shall result in a refund of said permit fees as set forth in subdivision (2) of this subsection. On a semiannual basis, the department shall submit to the commission a report which describes the different classes of permits and reports on the number of days it took the department to issue each permit from the date of receipt of the application and show averages for each different class of permits.

(5) During the department's technical review of the application, the department may request the applicant submit supplemental or additional information necessary for adequate permit review. The department's technical review letter shall contain a sufficient description of the type of additional information needed to comply with the application requirements.

(6) Nothing in this subsection shall be interpreted to mean that inaction on a permit application shall be grounds to violate any provisions of sections 644.006 to 644.141 or any rules promulgated pursuant to sections 644.006 to 644.141.

[13.] 14. The department shall respond to all requests for individual certification under Section 401 of the Federal Clean Water Act within the lesser of sixty days or the allowed response period established pursuant to applicable federal regulations without request for an extension period unless such extension is determined by the commission to be necessary to evaluate significant impacts on water quality standards and the commission establishes a timetable for completion of such evaluation in a period of no more than one hundred eighty days.

[14.] 15. All permit fees generated pursuant to this chapter shall not be used for the development or expansion of total maximum daily loads studies on either the Missouri or Mississippi rivers.

644.052. 1. Persons with operating permits or permits by rule issued pursuant to this chapter shall pay fees pursuant to subsections 2 to 8 and 12 to 13 of this section. Persons with a sewer service connection to public sewer systems owned or operated by a city, public sewer district, public water district or other publicly owned treatment works shall pay a permit fee pursuant to subsections 10 and 11 of this section.

2. A privately owned treatment works or an industry which treats only human sewage shall annually pay a fee based upon the design flow of the facility as follows:

(1) One hundred dollars if the design flow is less than five thousand gallons per day;

(2) One hundred fifty dollars if the design flow is equal to or greater than five thousand gallons per day but less than six thousand gallons per day;

(3) One hundred seventy-five dollars if the design flow is equal to or greater than six thousand gallons per day but less than seven thousand gallons per day;

(4) Two hundred dollars if the design flow is equal to or greater than seven thousand gallons per day but less than eight thousand gallons per day;

(5) Two hundred twenty-five dollars if the design flow is equal to or greater than eight thousand gallons per day but less than nine thousand gallons per day;

(6) Two hundred fifty dollars if the design flow is equal to or greater than nine thousand gallons per day but less than ten thousand gallons per day;

(7) Three hundred seventy-five dollars if the design flow is equal to or greater than ten thousand gallons per day but less than eleven thousand gallons per day;

(8) Four hundred dollars if the design flow is equal to or greater than eleven thousand gallons per day but less than twelve thousand gallons per day;

(9) Four hundred fifty dollars if the design flow is equal to or greater than twelve thousand gallons per day but less than thirteen thousand gallons per day;

(10) Five hundred dollars if the design flow is equal to or greater than thirteen thousand gallons per day but less than fourteen thousand gallons per day;

(11) Five hundred fifty dollars if the design flow is equal to or greater than fourteen thousand gallons per day but less than fifteen thousand gallons per day;

(12) Six hundred dollars if the design flow is equal to or greater than fifteen thousand gallons per day but less than sixteen thousand gallons per day;

(13) Six hundred fifty dollars if the design flow is equal to or greater than sixteen thousand gallons per day but less than seventeen thousand gallons per day;

(14) Eight hundred dollars if the design flow is equal to or greater than seventeen thousand gallons per day but less than twenty thousand gallons per day;

(15) One thousand dollars if the design flow is equal to or greater than twenty thousand gallons per day but less than twenty-three thousand gallons per day;

(16) Two thousand dollars if the design flow is equal to or greater than twenty-three thousand gallons per day but less than twenty-five thousand gallons per day;

(17) Two thousand five hundred dollars if the design flow is equal to or greater than twenty-five thousand gallons per day but less than thirty thousand gallons per day;

(18) Three thousand dollars if the design flow is equal to or greater than thirty thousand gallons per day but less than one million gallons per day; or

(19) Three thousand five hundred dollars if the design flow is equal to or greater than one million gallons per day.

3. Persons who produce industrial process wastewater which requires treatment and who apply for or possess a site-specific permit shall annually pay:

(1) Five thousand dollars if the industry is a class IA animal feeding operation as defined by the commission; or

(2) For facilities issued operating permits based upon categorical standards pursuant to the Federal Clean Water Act and regulations implementing such act:

(a) Three thousand five hundred dollars if the design flow is less than one million gallons per day; or

(b) Five thousand dollars if the design flow is equal to or greater than one million gallons per day.

4. Persons who apply for or possess a site-specific permit solely for industrial storm water shall pay an annual fee of:

(1) One thousand three hundred fifty dollars if the design flow is less than one million gallons per day; or

(2) Two thousand three hundred fifty dollars if the design flow is equal to or greater than one million gallons per day.

5. Persons who produce industrial process wastewater who are not included in subsection 2 or 3 of this section shall annually pay:

(1) One thousand five hundred dollars if the design flow is less than one million gallons per day; or

(2) Two thousand five hundred dollars if the design flow is equal to or greater than one million gallons per day.

6. Persons who apply for or possess a general permit shall pay:

(1) Three hundred dollars for the discharge of storm water from a land disturbance site;

(2) Fifty dollars annually for the operation of a chemical fertilizer or pesticide facility;

(3) One hundred fifty dollars for the operation of an animal feeding operation or a concentrated animal feeding operation;

(4) One hundred fifty dollars annually for new permits for the discharge of process water or storm water potentially contaminated by activities not included in subdivisions (1) to (3) of this subsection. Persons paying fees pursuant to this subdivision with existing general permits on August 27, 2000, and persons paying fees pursuant to this subdivision who receive renewed general permits on the same facility after August 27, 2000, shall pay sixty dollars annually;

(5) Up to two hundred fifty dollars annually for the operation of an aquaculture facility.

7. Requests for modifications to state operating permits on entities that charge a service connection fee pursuant to subsection 10 of this section shall be accompanied by a two hundred-dollar fee. The department may waive the fee if it is determined that the necessary modification was either initiated by the department or caused by an error made by the department.

8. Requests for state operating permit modifications other than those described in subsection 7 of this section shall be accompanied by a fee equal to twenty-five percent of the annual operating fee assessed for the facility pursuant to this section. The department may waive the fee if it is determined that the necessary modification was either initiated by the department or caused by an error made by the department.

9. Persons requesting water quality certifications in accordance with Section 401 of the Federal Clean Water Act shall pay a fee of seventy-five dollars and shall submit the standard application form for a Section 404 permit as administered by the U.S. Army Corps of Engineers or similar information required for other federal licenses and permits, except that the fee is waived for water quality certifications issued and accepted for activities authorized pursuant to a general permit or nationwide permit by the U.S. Army Corps of Engineers.

10. Persons with a direct or indirect sewer service connection to a public sewer system owned or operated by a city, public sewer district, public water district, or other publicly owned treatment works shall pay an annual fee per water service connection as provided in this subsection. Customers served by multiple water service connections shall pay such fee for each water service connection, except that no single facility served by multiple connections shall pay more than a total of seven hundred dollars per year. The fees provided for in this subsection shall be collected by the agency billing such customer for sewer service and remitted to the department. The fees may be collected in monthly, quarterly or annual increments, and shall be remitted to the department no less frequently than annually. The fees collected shall not exceed the amounts specified in this subsection and, except as provided in subsection 11 of this section, shall be collected at the specified amounts unless adjusted by the commission in rules. The annual fees shall not exceed:

(1) For sewer systems that serve more than thirty-five thousand customers, forty cents per residential customer as defined by the provider of said sewer service until such time as the commission promulgates rules defining the billing procedure;

(2) For sewer systems that serve equal to or less than thirty-five thousand but more than twenty thousand customers, fifty cents per residential customer as defined by the provider of said sewer service until such time as the commission promulgates rules defining the billing procedure;

(3) For sewer systems that serve equal to or less than twenty thousand but more than seven thousand customers, sixty cents per residential customer as defined by the provider of said sewer service until such time as the commission promulgates rules defining the billing procedure;

(4) For sewer systems that serve equal to or less than seven thousand but more than one thousand customers, seventy cents per residential customer as defined by the provider of said sewer service until such time as the commission promulgates rules defining the billing procedure;

(5) For sewer systems that serve equal to or less than one thousand customers, eighty cents per residential customer as defined by the provider of said sewer service until such time as the commission promulgates rules defining the billing procedure;

(6) Three dollars for commercial or industrial customers not served by a public water system as defined in chapter 640, RSMo;

(7) Three dollars per water service connection for all other customers with water service connections of less than or equal to one inch excluding taps for fire suppression and irrigation systems;

(8) Ten dollars per water service connection for all other customers with water service connections of more than one inch but less than or equal to four inches, excluding taps for fire suppression and irrigation systems;

(9) Twenty-five dollars per water service connection for all other customers with water service connections of more than four inches, excluding taps for fire suppression and irrigation systems.

11. Customers served by any district formed pursuant to the provisions of section 30(a) of article VI of the Missouri Constitution shall pay the fees set forth in subsection 10 of this section according to the following schedule:

(1) From August 28, 2000, through September 30, 2001, customers of any such district shall pay fifty percent of such fees; and

(2) Beginning October 1, 2001, customers of any such districts shall pay one hundred percent of such fees.

12. Persons submitting a notice of intent to operate pursuant to a permit by rule shall pay a filing fee of twenty-five dollars.

13. For any general permit issued to a state agency for highway construction pursuant to subdivision (1) of subsection 6 of this section, a single fee may cover all sites subject to the permit.