HCS/HBs 1207 & 622 - Under the act, the construction of any earthen basin to retain and settle non-toxic, non-metallic earthen materials such as soil, silt, and rock, is excluded from the construction permit requirement where such permit is required to construct, build, replace or make major modification to any point source or collection system designed to convey or discharge human sewage to waters in the state. This act also repeals certain provisions of law from a non-severability clause enacted as part of HB 89 (2011). This act is identical to provisions SCS/HCS/HB 631 (2023), SCS/JCS/HB 779 (2023), SB 266 (2023), the perfected HCS/HBs 1207 & 622 (2023). and similar to the truly agreed to and finally passed CCS/HCS/SB 109 (2023). JULIA SHEVELEVA
|